Clever FB Meta Pixel

🏈 Enter to Win 2 Tickets to See the Lions vs. the Bears at Ford Field 🏈

Request a Consultation
David G.

Matrix ripped out the old tub, gutted the bath area back to the studs, installed new drywall, new acrylic surround, walk-in shower with seat, and new ceiling fan. In and out in one day, with good clean-up after themselves. The Team: Shane, Anton, Vitalli, and Walter.

Share on Facebook Share on Twitter Share on LinkedIn Share via Email

All reviews

Request appointment?

4.5 out of 5
Out of 940 Reviews
Lifetime Warranty
Basement Finishing